Albuquerque International Sunport Long-Term Parking Photovoltaic Improvements ClientAlbuquerque International Sunport, City of Albuquerque Completion2013 Size4,000 PV Panels/Two 500kW Inverters Cost$3,306,999 Molzen Corbin designed and provided construction phase services for a 1 Megawatt solar photovoltaic system in the long-term parking lot at the Albuquerque International Sunport. We leveraged federal funding to develop the system installed on top of carports mounted on … Read More
Albuquerque International Sunport Airfield Lighting Improvements
Albuquerque International Sunport Airfield Lighting Improvements ClientAlbuquerque International Sunport, City of Albuquerque Completion2010 SizeMore than 1,500 Fixtures Cost$3,257,047 This project involves changing out over 1,500 airfield light fixtures and guidance signs. Also included in this upgrade project is the construction of a fiber optic link between the airfield lighting system and the Air Traffic Control Tower. The new fiber optic … Read More
Santa Fe Municipal Airport Runway 2-20 MIRL Replacement
Santa Fe Municipal Airport Runway 2-20 MIRL Replacement ClientSanta Fe Municipal Airport Completion2014 Size8366 x 150 Feet Cost$514,645 Molzen Corbin designed and performed construction administration and observation services for the replacement of the Runway 2-20 medium intensity runway lighting (MIRL) system. A new can and conduit system with LED lighting replaced an existing quartz direct buried system. Runway 2-20 is … Read More
Moriarty SCADA System
Moriarty SCADA System ClientMoriarity Completion2017 SizeN/A Cost$288,511 The City of Moriarty’s Supervisory Control and Data Acquisition (SCADA) system has brought a significant change to the way the City’s water distribution system is controlled and monitored. For 10 years the water system required significant operator involvement. Driving from site-to-site to start and stop pumps, record data and then take the data … Read More
Mesilla Plaza Kiosko
Mesilla Plaza Kiosko ClientMesilla Completion2014 SizeN/A Cost$155,982 The historic Plaza in Mesilla is the focal point of the downtown area and a celebration space for the entire community. Over many years, the kiosko at the center of the Plaza had deteriorated almost to the point of collapse. The Molzen Corbin team designed improvements that re-used as much of the original … Read More
Los Lunas Fire Station
Los Lunas Fire Station #2 ClientLos Lunas Completion2018 Size16,000 Square Feet Cost$4,022,860 The talents of the Molzen Corbin design team integrated the needs of the community on a site owned by the Village and provided ample space for the building, as well as space for maneuverability of large vehicles and a training yard with a training tower. This facility is … Read More
Las Cruces Cogeneration System
Las Cruces Cogeneration System ClientLas Cruces Completion2018 SizeTwo 300-kW Generators Cost$4,485,268 The City of Las Cruces hired Molzen Corbin to design a cogeneration facility at the Jacob A. Hands Wastewater Treatment Plant. The new facility would take methane, which is a byproduct of the digestion process, and use it to create electrical power and usable heat. This facility includes gas … Read More