Wastewater Lift Station No. 85 Rehabilitation ClientAlbuquerque Bernalillo County Water Utility Authority Completion2014 Size 21.8 MGD effluent filtration facility Cost$372,360 ABCWUA selected Molzen Corbin to assist with rehabilitation of Wastewater Lift Station No. 85. This included changing the voltage of the lift pumps and the control panel from 208V to 480V and replacing the outdated bubbler level controls with ABCWUA … Read More
Las Cruces Screw Pump Lift Station Conversion
Las Cruces Screw Pump Lift Station Conversion ClientLas Cruces Completion2010 Size17,000 GPM Cost$1,269,000 Molzen Corbin worked with the City of Las Cruces to convert the influent lift station for the wastewater treatment plant from a screw pump to a submersible pump lift station. Molzen Corbin reused the old structure as a wet well with submersible pumps. A new structural wall … Read More
Anthony Sonic Lift Station
Anthony Sonic Lift Station ClientAWSD Completion2019 Size6,500 LF PVC Force Main 3,500 LF Sewer Line Cost$4,274,915 Molzen Corbin completed a Sonic Lift Station for AWSD that provides a sustainable, reliable, and cost-effective wastewater collection and pumping system for the community. The existing lift station, which served 85% of the community, was in poor condition, had minimal storage capacity, and experienced … Read More
Puerto del Sol Reuse Facilities
Puerto del Sol Reuse Facilities ClientAlbuquerque Bernalillo County Water Utility Authority Completion2013 Size 21.8 MGD Cost$4,244,200 Molzen Corbin designed and helped construct extensive treatment and reuse facilities for ABCWUA. The facilities include a 21.8 MGD effluent filtration facility consisting of six basins of cloth disk filters enclosed in a 4,750-squarefoot building. The reuse water is pumped from the treatment facility … Read More
Carlsbad Double Eagle Water System Improvements: Tank and Chlorination Facility (Phase III)
Carlsbad Double Eagle Water System Improvements: Tank and Chlorination Facility (Phase III) ClientCity of Carlsbad Completion2020 (Phase III) Size31,440 LF Water/Transmission Line 5-Million Gallon Tank Cost$11,621,305 (Phase III) Building on the success of Phases I and II of the City of Carlsbad’s Double Eagle Water System Improvements Project, the goal of Phase III was to extend the water supply from … Read More
AWSD Waterline and Rio Grande Directional Drill Crossing
AWSD Waterline and Rio Grande Directional Drill Crossing ClientAWSD Completion2019 Size2.5 Miles of Water Lines 895 LF Horizontal Directional Drill” Cost$892,689 AWSD sought Molzen Corbin’s assistance with providing potable water for an area of Dona Ana County that was being served by both an aging, inadequate water system and wells that had gone dry. Many residents had resorted to hauling … Read More
Carlsbad Double Eagle Water System Improvements (Phases I and II)
Carlsbad Double Eagle Water System Improvements (Phases I and II) ClientCity of Carlsbad Completion2015 Size40 miles of 16-inch and 24-inch Waterline (8 pressure-reducing/pressure sustaining valve stations) Cost$9,378,498 (Phase I) $13,530,393 (Phase II) The City of Carlsbad wanted to transition its primary water supply to the Double Eagle Wellfield located more than 40 miles away. When the City awarded Molzen Corbin … Read More
Las Cruces West Mesa Water System Improvements
Las Cruces West Mesa Water System Improvements ClientCity of Las Cruces Completion2010 (Phase IV-B) Size2 Wells (3,500 GPM each) 46,500 LF water and transmission line 4.5-Million Gallon Reservoir Cost$931,021 (Phase IV-B) This was a four-phase project that included various water supply, transmission, and storage improvements. Highlights included a high-capacity booster station consisting of three 1,000 GPM booster pumps, as well … Read More
Tijeras Well No. 3
Tijeras Well No. 3 ClientVillage of Tijeras CompletionUnder Construction Size90 GPM CostUnder Construction The Village of Tijeras supplies water to its residents with two groundwater wells. In the past few years, Well No 1 has been losing capacity and is not expected to remain a viable source of supply for much longer. The Molzen Corbin Team designed and oversaw drilling … Read More
Carlsbad Sheep Draw Well 6
Carlsbad Sheep Draw Well 6 ClientCity of Carlsbad Completion2016 Size2,400 GPM Cost$1,149,414 Molzen Corbin completed the Phase I Design of the Sheep Draw Well 6 Project in Carlsbad, New Mexico. Construction of this $1.2 million project was completed in March 2016. This 810-foot deep well with 34-inch diameter conductor casing and 18-5/8-inch production casing was drilled in the hard rock … Read More