Wastewater Lift Station No. 85 Rehabilitation ClientAlbuquerque Bernalillo County Water Utility Authority Completion2014 Size 21.8 MGD effluent filtration facility Cost$372,360 ABCWUA selected Molzen Corbin to assist with rehabilitation of Wastewater Lift Station No. 85. This included changing the voltage of the lift pumps and the control panel from 208V to 480V and replacing the outdated bubbler level controls with ABCWUA … Read More
Las Cruces Screw Pump Lift Station Conversion
Las Cruces Screw Pump Lift Station Conversion ClientLas Cruces Completion2010 Size17,000 GPM Cost$1,269,000 Molzen Corbin worked with the City of Las Cruces to convert the influent lift station for the wastewater treatment plant from a screw pump to a submersible pump lift station. Molzen Corbin reused the old structure as a wet well with submersible pumps. A new structural wall … Read More
Anthony Sonic Lift Station
Anthony Sonic Lift Station ClientAWSD Completion2019 Size6,500 LF PVC Force Main 3,500 LF Sewer Line Cost$4,274,915 Molzen Corbin completed a Sonic Lift Station for AWSD that provides a sustainable, reliable, and cost-effective wastewater collection and pumping system for the community. The existing lift station, which served 85% of the community, was in poor condition, had minimal storage capacity, and experienced … Read More
Puerto del Sol Reuse Facilities
Puerto del Sol Reuse Facilities ClientAlbuquerque Bernalillo County Water Utility Authority Completion2013 Size 21.8 MGD Cost$4,244,200 Molzen Corbin designed and helped construct extensive treatment and reuse facilities for ABCWUA. The facilities include a 21.8 MGD effluent filtration facility consisting of six basins of cloth disk filters enclosed in a 4,750-squarefoot building. The reuse water is pumped from the treatment facility … Read More
Barelas Storm Drainage
Barelas Storm Drainage ClientAlbuquerque Completion2007 Size182,000 GPM Cost$825,922 Hundred-year storms overwhelmed the Barelas Pump Station in 2006, contributing to flooding that displaced hundreds of residents. After analysis of the station’s equipment and communication with operators, Molzen Corbin determined that the existing bar screen needed to be replaced. Additionally, a hydraulic analysis of the station indicated that the influent channel needed … Read More
Valley Drive
Valley Drive ClientNMDOT Completion2020 Size1.5 Miles Cost$25,598,110 The Molzen Corbin project team successfully addressed project challenges and transformed Valley Drive into a modern urban corridor in the heart of the City of Las Cruces that will make traveling safer and more efficient for decades to come. These improvements included enhanced driving lanes, turning lanes, buffered bicycle lanes, buffered sidewalks, raised … Read More
Double Eagle II Aerospace Technology Park Infrastructure Improvements
Double Eagle II Aerospace Technology Park Infrastructure Improvements ClientDouble Eagle II, City of Albuquerque Completion2008 Size200 Acres Cost$3,000,000 Molzen Corbin designed and provided construction administration services for the extension of utilities (storm drainage, water, sanitary sewer, electricity and fiber optic communication) to the 200 acre Aerospace Technology Park (ATP). The project was designed on a fast track schedule to allow … Read More
Double Eagle II Midfield Development, Phases I & II
Double Eagle II Midfield Development, Phases I & II ClientDouble Eagle II, City of Albuquerque Completion2006 Size50 Acres Cost$3,244,744 Continued growth at DE II Airport created a demand for additional aircraft storage. This project included utility, landside, and airside extension and access improvements for approximately 50 acres of additional lease area adjacent to the existing hangar and fixed base operator … Read More
Spaceport Water & Sewer Systems
Spaceport Water & Sewer Systems ClientSpaceport Completion2011 Size4 Wells 1.3-Gallon Water Tank 63,000 LF Water Supply Line 14,950 LF Water Transmission Line 17,300 LF Wastewater Collection Line 20,000-Gallon Effluent Tank Cost$9,700,000 The location of Spaceport America in a region with limited water resources made it necessary to use and re-use available water as efficiently as possible. Water: Developing a sustainable … Read More
- Page 2 of 2
- 1
- 2