Client
Santa Fe
Completion
2009
Size
800HP Booster Pump/
3,200A Switchboard
Cost
$3 M
Molzen Corbin provided complete electrical design for new Booster Stations # 4A and #5A at the new Buckman Water Treatment Plant. The booster stations are housed in a single structure and consist of a combined 800HP of booster pumps powered by a 3,200A switchboard and feed from a redundant set of 2MVA service transformers.
Scope of Work
Electrical Engineering