Client
Bernalillo County
Completion
2015
Size
1.2 Miles
Cost
$4,988,421
Goff Boulevard is a major thoroughfare through Albuquerque’s South Valley neighborhood. However, the road desperately needed to remedy two issues: flooding with heavy rain and safety at a three-way stop. We resolved these challenges by designing new storm drains along the road and implementing a High T design at the three-way stop. Goff was also converted from two lanes to three, with fully compliant ADA access for bicycles and pedestrians. This project involved a complex storm drain installation, coordination with many property owners along the street, and coordination with several utilities, as it required the relocation of power, water, sewer, cable, and telephone lines.