Client
NMDOT
Completion
2013
Size
170-Square Mile Watershed
Cost
$40,173,034
(Part of Larger 1-10 Interstate Project)
The 6-lane corridor features more than 140 culvert extensions on the median to handle stormwater flows. The drainage basins extended from I-10 on the western end to the mountain peaks of the Organ and Franklin Mountains to the east. Overall, there were 237 sub-basins, and a total of 170 square miles of watershed analyzed.
Scope of Work
Drainage Engineering