Client

NMDOT

Completion

2014

Size

10-Square Mile Watershed

Cost

$34,857.28


NMDOT tasked Molzen Corbin with completing a drainage report including scour analysis for the drainage basin contributing to the I-25 Milepost 155.5 Bridge crossing. The 10-square-mile drainage area was analyzed using HEC-HMS and HECRAS. Due to the rural conditions and drainage area size, Molzen Corbin compared scour analysis results based on the inputs from multiple hydrologic analysis methods.

Scope of Work

Drainage Engineering